Manufacture

We specialise in the assembly of hydraulic systems and industrial furnace components, as well as the welding of copper moulds and the processing of various materials such as stainless steel, Inconel, and Super Duplex.

Our expertise includes :

Hydraulic
Systems

Industrial oven: component assembly

Copper welding:
repair of copper moulds

Processing of stainless steel and steel: 316L stainless steel, nickel alloys, Duplex, Super Duplex, Inconel, aluminium, copper…

Our structure enables us to provide our clients with a comprehensive and robust industrial solution through our internal process, which consists of these clearly defined steps:

1
Client Needs Analysis
(Study of the Specifications Document)
Objective: Understand the client's technical requirements

Actions:

  • Study of plans and technical specifications

  • Definition of materials and standards to be complied with

2
Design & Engineering
Objective: Design bespoke solutions

Actions:

  • 3D modelling (CAD)

  • Structural and resistance calculations

  • Validation of plans according to standards (ASME, EN, RCCm-X)

3
Manufacturing & Assembly
(Chaudronnerie)
Objective: Manufacture parts and assemble structures

Actions:

  • Metal cutting and forming (stainless steel, Inconel, Super Duplex)

  • Welding in compliance with WPS and WPQR standards

  • Assembly of hydraulic systems and furnace enclosures

4
Quality Control
Objective: Ensure product compliance

Actions:

  • Dimensional and visual inspection

  • Leak-tightness and strength testing

  • Preparation of manufacturer's documentation

5
Delivery and Installation
Objective: Ensure the installation of equipment

Actions:

  • Secure transport of components

  • On-site installation

  • Commissioning and operational testing

6
Maintenance and Follow-up
Objective: Ensure the longevity of installations

Actions:

  • Preventive and corrective maintenance

  • Customised maintenance contracts

  • Supply of spare parts and consumables

Our achievements

Infrared Oven
February 2025


Installation of the Romishape and training -
March 2025

Infrared ovens for heating dies
-
May 2023

Infrared ovens
-
April 2022

Restoration of conventional die ovens
-
2023/2024